Waste treatment plant Tibro

Reningsverk Tibro Coverto

PROJECT DESCRIPTION

Client:  Asplunds Bygg
Location:  Tibro, Sweden
Area:  12 000 m2
Completed:  2022
Description:  Coverto has been enthrusted to deliver and install high-profile roofing sheet (TRP) also knows as decking profiles, concrete plinth, steel stairs and sandwich panels with accessories for the treatment plant in Tibro, Västra Götaland.

One of the new facilities contains filter steps that clean all the water that is released.

The second facility is for receive filtering. At the beginning of 2023, the construction is expected to be completed, and then Tibro will have a treatment plant that both cleans better than today and that can also cope with an expected increase in population for a long time to come.

Snabbgross

Snabbgross Coverto

PROJECT DESCRIPTION

Client:  Asplunds Bygg
Location:  Skövde, Sweden
Area:  approx. 1 800 m2
Completed:  2022
Description:   Coverto was enthrusted to design, deliver and install steel frame, trusswork, roof incl. roof covering, concrete plinth, steel frame for mezzanine, sandwich panels with accessories and a canopy.

The main customer wanted an entrance portal that had a smooth surface, long span of 10 m, hidden fastening, no visible vertical joints/fittings, special color and that the sandwich panels would be aligned with the existing facade.

We solved this with a cost-effective special solution together with our suppliers. The solution is unique and something we take with us as an offer in other projects.

Ebrex

IMG_5034

Project Description

Client:   Logistic Contractor
Location:   Örebro, Sweden
Area:   12 000 m2
Completed:   2019
Description:   Logistic Contractor developed a new warehouse for British Ebrex for Ford’s spare parts in the autumn of 2018. Coverto has carried out the installation the exterior sandwich panels, roof drainage, sheet metal work and steel stairs.

Media Markt

18.

Project Description

Client:   Skanska
Location:   Gothenburg, Sweden
Area: 380 m2
Completed:   2016
Description: Media Markt needed to reduce its retail space. Coverto delivered and installed 2 parallel vertical sandwich walls with a safety class II and one air gap between them to cope with the sound requirements while ongoing trading was ongoing. Good planning and risk analysis was required in order to perform efficient work in 3 weeks.

Pepsi

9

Project Description

Client:   Al Jomaih
Location:   Dammam, Saudi Arabia
Area: 55,000 m2
Completed:   2014
Description: The facility, which is located in Dammam, is the company’s 15th manufacturing plant in the Middle East. It will be used to produce a range of PepsiCo snacks. Coverto/CLADME delivered wall and roof sandwich panels in accordance with Leadership in Energy and Environmental Design (LEED) building standards.

Procter & Gamble

1

Project Description

Client:   Arcon
Location:   Damman, Saudi Arabia
Area: 3000 m2
Completed:   2013
Description: Coverto / CLADME delivered internal and external sandwich walls to complement Procter & Gamble’s new extension building.

Schlumberger

8

Project Description

Client:   Arcon
Location:   Dhahran, Saudi Arabia
Area: 7000 m2
Completed:   2008
Description: Coverto / CLADME delivered internal and external sandwich walls to Schlumberger’s new industrial building in Saudi Arabia. Schlumberger is the leading service provider for the petroleum industry.

IKEA

6-2

Project Description

Client:   Arcon
Location:   Riyadh, Saudi Arabia
Area: 30,000 m2
Completed:   2005
Description: Coverto / CLADME delivered all exterior and interior sandwich walls and sandwich roofs to one of the largest IKEA department stores in the Middle East.